• Subtitle
    Subtitle English
    • 1. English
    • 2. Spanish
    • 3. Latin
    • 4. Portugese
    • 5. Italian
    • 6. French
    • 7. German
    • 8. Dutch
    • 9. Russian
    • 10. Japanese
    • 11. Chinese
    • 12. Arabic
  • Subtitle
    Server Local
    • Server Local
    • Apple TV 4K
      Watch 4K
    • Google Play Movies 4K
      Watch 4K
    • Vudu 4K
      Watch 4K
    • Apple TV HD
      Watch HD
    • Amazon Video HD
      Watch HD
    • Vudu HD
      Watch HD
    • Apple TV SD
      Watch SD
    • Google Play Movies SD
      Watch SD
    • Vudu SD
      Watch SD
This video option does not contain pop-up windows and the load is optimal, you can watch without cuts.
Studio 60 on the Sunset Strip

1 Season
22 Episode

Studio 60 on the Sunset Strip - Season 1 Episode 5 The Long Lead Story


(114 votes, average: 7.38/ 10)

42 minutes 2024 HD

  • Share

During cast rehearsals with Lauren Graham and Sting, a reporter attempts to get the real story on Matt and Harriet. Meanwhile Jordan passes on a tasteless new reality series.

img

Season

Similar

  • 2006
    imgS4 E13

    Less than Perfect

    Less than Perfect

    6.87 2006 HD

    Claude Casey moved up in the secretarial world of television news, from temp to the anchor's desk. After her boss hires her full time, Claude...

    img
  • 1987
    imgS1 E2

    Roxie

    Roxie

    1 1987 HD

    Roxie is a spin-off of Kate & Allie that aired on CBS from April 1, 1987 to April 8. The sitcom was cancelled after two episodes.

    img
  • 2018
    imgS1 E16

    A Poem A Day

    A Poem A Day

    6.60 2018 HD

    Story follows a group of physical therapists, nurses, radiological technologists and trainees. Ye Jae-Wook works as a physical therapist and also...

    img
  • 2004
    imgS2 E10

    An American in Canada

    An American in Canada

    1 2004 HD

    Jake Crewe is an American television news host who is forced, after beating up his station manager, to accept a job in Calgary, Alberta as the host...

    img
  • 2000
    imgS2 E22

    Sports Night

    Sports Night

    7.32 2000 HD

    The offbeat cast and crew of a sports news show deal with professional, personal, and ethical challenges while functioning in a pressure-cooker work...

    img
  • 2016
    imgS1 E12

    Nothing Remains the Same

    Nothing Remains the Same

    4.50 2016 HD

    Set in the 1950s, the plot follows the fictional creation of the first Brazilian TV station.

    img
  • 1989
    imgS1 E8

    A Fine Romance

    A Fine Romance

    5.00 1989 HD

    A Fine Romance is an American comedy-drama series that aired from January 18, 1989 to March 2, 1989. The series was filmed on location at various...

    img
  • 1970
    imgS E

    Nobody's Watching

    Nobody's Watching

    1 1970 HD

    Nobody's Watching is a television program that was never aired. It originated with and was written by Scrubs creator Bill Lawrence, as well as Neil...

    img
  • 1978
    imgS1 E6

    The American Girls

    The American Girls

    3.50 1978 HD

    The American Girls is an American drama series that aired on CBS on Saturday night from September 23, 1978 to November 10, 1978.

    img
  • 2004
    imgS3 E7

    LateLine

    LateLine

    1 2004 HD

    LateLine is an American TV sitcom that ran on NBC from March 17, 1998, through March 16, 1999. Due to an abrupt cancellation, there were seven...

    img

Recomendation

  • 2015
    imgS2 E14

    Newsreaders

    Newsreaders

    7.38 2015 HD

    Newsreaders is a quarter-hour format American television comedy that lampoons the news magazine genre. The series is a spinoff of the Adult Swim show...

    img
  • 2001
    imgS2 E13

    Jack & Jill

    Jack & Jill

    7.50 2001 HD

    A lighthearted romantic comedy about post-collegiate life, love and career in New York City.

    img
  • 2022
    imgS1 E8

    Lucky!

    Lucky!

    9.10 2022 HD

    The extraordinary story of Bernie Ecclestone's meteoric rise from post-war car dealer to the creation and 50-year reign over the cutthroat world of...

    img
  • 1987
    imgS6 E3

    Faerie Tale Theatre

    Faerie Tale Theatre

    8.60 1987 HD

    A live-action children's television anthology series retelling popular fairy tales.

    img
  • 2015
    imgS1 E5

    Texas Rising

    Texas Rising

    6.30 2015 HD

    A chronicle of the Texas Revolution, the uprising against the tyranny of Mexican dictator Santa Anna, from the battle of the Alamo to the battle of...

    img
  • 2011
    imgS1 E9

    Mr. Sunshine

    Mr. Sunshine

    6.32 2011 HD

    Ben Donovan is a self-involved manager of a second-rate San Diego sports arena who begins to re-evaluate his life on his 40th birthday. Working...

    img
  • 2018
    imgS1 E8

    1983

    1983

    6.58 2018 HD

    Twenty years after a devastating terrorist attack in 1983 that halted the course of Poland's liberation and the subsequent downfall of the Soviet...

    img
  • 2009
    imgS1 E17

    Life on Mars

    Life on Mars

    6.48 2009 HD

    After a car crash, police detective Sam Tyler mysteriously finds himself transported back to 1973 and still working as a detective.

    img
  • 2019
    imgS6 E10

    Madam Secretary

    Madam Secretary

    6.98 2019 HD

    After years away from the CIA, Elizabeth McCord is pulled back into the political arena. The newly appointed Secretary of State is tough, fair, and...

    img
  • 2007
    imgS1 E12

    The Dresden Files

    The Dresden Files

    6.97 2007 HD

    A Chicago-based wizard works as a private investigator.

    img